Zhang Feiteng
School of Mines, China University of Mining and Technology, Xuzhou, Jiangsu Province, China, 221116
E-mail: zhangft@gcjp88.net
Education Background
Doctor of Engineering, School of Mines (CUMT), 2024
Bachelor of Engineering, School of Mines (CUMT), 2018
Experience
Postdoctoral fellow, School of Environment and Spatial Informatics (CUMT), China, 2024.06-Present, full time
Areas of Research Interests/ Research Projects
Ground control
Hydraulic fracturing
Papers Published in English Journals:
1. Zhang F, Wang X, Bai J, et al. Fixed-Length Roof Cutting with Vertical Hydraulic Fracture Based on the Stress Shadow Effect: A Case Study[J]. International Journal of Mining Science and Technology, 2022,32(2):295-308.
2. Zhang F, Wang X, Bai J, et al. Study on Hydraulic Fracture Propagation in Hard Roof Under Abutment Pressure[J]. Rock Mechanics and Rock Engineering, 2022,55(10):6321-6338.
3. Zhang F, Wang X, Wang Q, et al. Numerical Modeling of Engineering-Scale Jointed Coal Mass and Confining Pressure Effect[J]. Applied Sciences, 2024,14(24):11844.
4. Zhang F, Wang X, Bai J, et al. Post-Peak Mechanical Characteristics of the High-Water Material for Backfilling the Gob-Side Entry Retaining: From Experiment to Field Application[J]. Arabian Journal of Geosciences, 2020,13(11):386.
5. Chen D, Wang X, Zhang F, et al. Study on the Mechanism of Progressive Instability of Special-Shaped Coal Pillar and the Stability Control of Roadway Under the Influence of Mining[J]. Rock Mechanics and Rock Engineering, 2024,57(8):6461-6483.
Selected Invention Patents:
1. Zhang F, Wang X, Bai J, et al. Integrated Equipment for Multi-stage Drilling Sealing, Fracturing, Grouting and Water Injection and Its Application Method[P]. ZL201910699081.1, 2024-05-10, Authorized.
2. Zhang F, Wang X, Bai J, et al. Segmented Directional Hydraulic Fracturing Method for Thick Hard Roof in Gob-side Entry Retaining[P]. ZL202110361261.6, 2022-03-15, Authorized.
3. Zhang F, Wang X, Bai J, et al. Hydraulic Fracturing Roof-cutting Method for Gob-side Entry Retaining in Thick Coal Seam[P]. ZL202110333342.5, 2021-12-31, Authorized.
4. Wang X, Zhang F, Bai J, et al. Underground Construction Method for Hydraulic Fracturing of High-position Roof in Coal Seam Group[P]. ZL202010573165.3, 2021-02-09, Authorized.
5. Wang X, Zhang F, Yi W, et al. Hydraulic Fracturing Trajectory Determination Method Based on Borehole Imaging Device[P]. ZL202010150233.5, 2021-02-26, Authorized.